Project: bbellamy   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Brad Bellamy   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1890.7
Total Flight Time:
Start/Last Date:Jan 01, 2001 - No Finish Date
Engine:IO-360
 
Friendly URL: https://eaabuilderslog.org?s=bbellamy

Home or Last Project Picture

Jun 02, 2022     Electrical Tool Research - (3.5 hours) Category: Research
Searched for source of heat gun specified in TE Connectivity/Raychem documents for use with shield solder sleeves. Selected a heat gun kit with the necessary accessories.
Searched for positioners needed for my DMC crimp tool for the High Density D-Sub connector pins.
Looked up specifications for the Ideal wire stripper tools I bought and the ones Bill Moody gave me to make sure they were acceptable for the wire I am using. Reviewed other wiring tools and tested the D-Sub pin insertion and removal tools.
Looked at components and tools on the Stein Air and B and C Aviation websites.
Continued research on Garmin and Dynon to prepare for meeting the Garmin next week. Researched configuration of engine and airframe sensors and inputs.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.